跳到内容

正版赌钱app下载公司的下一个125

化学武器拆卸 & 破坏

横幅图像ALT

正版赌钱app下载在美销毁最后一批弹药.S. 化学武器储备

正版赌钱app下载已经与美国国防部合作.S. Department of 国防 over the last several decades to destroy the U.S. 化学武器储存 before September 2023 as part of the 化学物质 Weapons Convention. 

Using neutralization and bio-treatment technology, 自动化, 静爆室, the Bechtel team has safely processed munitions at several different sites.  

2023年7月, the Bechtel-led team at the Blue Grass Chemical Agent-破坏 Pilot Plant destroyed the final munition in the U.S. 储备.  

Bechtel’s Long 历史 in Chemical Demilitarization

Though never used by the United States, chemical weapons were 储备d at a number of U.S. 二战期间和战后的军事基地. Since the 1980s, Bechtel has had an active role in U.S. chemical demilitarization projects and international efforts to eliminate chemical weapons.  

With the completion of the destruction of the 储备s in Kentucky and a sister plant in Colorado, along with previous projects in Alabama and Maryland, 正版赌钱app下载已经安全淘汰了近5个,000吨化学武器火箭, 枚炮弹, mortar shells and cannisters at four of the nine original U.S. 存储仓库. 

图片库

 

利用正版赌钱app下载的专业知识和创新, 正版赌钱app下载团队设计的, 建, 测试, and operated first-of-a-kind facilities to destroy chemical weapons at several locations including: 

  • Pueblo Chemical Agent 破坏 Pilot Plant in Colorado

    The Bechtel-led team has safely destroyed 2,613 tons of mustard agent inside World War II era munitions stored at the U.S. Army Pueblo Chemical Depot using neutralization followed by biotreatment and explosive destruction technologies. 同时操作, the plant neutralized and biotreated projectiles and mortar rounds that made up eight percent of the original U.S. 化学武器储存. The Pueblo Plant destroyed more than 780,000 mustard agent-filled projectiles and mortar rounds. The final munition at the Pueblo Chemical Depot was destroyed in June of 2023.

  • Blue Grass Chemical Agent 破坏 Pilot Plant in Kentucky

    The Bechtel-led team destroyed more than 100,000 mustard agent and nerve agent-filled projectiles and rockets. 超过523个美国.S. tons of chemical agents were destroyed using neutralization and explosive destruction technologies. The final munition at the Blue Grass Army Depot was safely destroyed in July of 2023.

  • Aberdeen Chemical Agent Disposal Facility in Maryland

    Bechtel led the team that successfully completed the first destruction of a 化学武器储存 at a continental U.S. 军事基地,阿伯丁试验场. 储备物资包括,817个钢罐, each containing almost a ton of liquid-form mustard agent. Bechtel designed a system for draining and neutralizing the agent from the cannisters. The final container was emptied and treated in 2006.

  • Anniston Chemical Agent Disposal Facility in Alabama

    Bechtel constructed the facility that destroyed 661,529件武器包含2,现场储存了254吨化学药剂. Facilities designed and constructed by Bechtel included four incinerators, 污染消减系统, 过滤系统. The design and construction phase lasted between 1996 and 2001, 该工厂在2003年至2011年期间运行.

特色项目